Approximately G A U G E Mesh Body 19 stitches = 4 inches 11.5 rows = 4 inches Stitch for gauge: sc, *(ch 2, skip 1, sc in gap space), repeat from * until end of row, sc in last stitch Ribbed Trim 24 stitches = 4 inches 26 rows = 4 inches Stitch for gauge: sl st in BLO N O T E S Beginning chain does NOT count as a stitch in stitch counts Example photographs are in Adult S/M size Stitch count is in [ ] at the end of each row Cover-up is worked in sections and then seamed together Cover-up back and front panel sections are worked in rows from the top of the garment down Ribbed trim is worked in rows around the openings of the cover-up after the sections are seamed together Pattern is broken into 3 sections: 1

A few planning notes that go a long way: Arrive 10 to 15 minutes before showtime, since the experience is timed and seating is part of the production setup Bring a valid ID, since the 21 and older requirement is enforced at the door for every guest If anyone in the party prefers a non-alcoholic option, request the zero-proof mocktail substitution at check-in Plan dinner before or dessert and a nightcap after, since 90 minutes is enough to be the highlight of the evening but light enough to anchor a longer night out Consider valet parking at the Cambria Hotel Detroit Downtown or a ride-share drop-off at 600 West Lafayette Boulevard, especially on event nights when downtown street parking is competitive For couples building a full date night, downtown Detroit is dense enough that a pre-speakeasy dinner and post-show drink can both happen within a short walk of the venue
Turn off the heat and add in the stale cornbread and cranberries and stir
The barely-there look consisted of extremely sheer, flowy fabric covered in brilliant crystals